(754) 714-8445
Top-down aerial view of a completed red concrete tile roof beside a pool.

M&M Roofing Services

Roof Replacement Built for South Florida

Ready to replace your roof? M&M Roofing helps you compare tile, metal, shingle and flat roof options, understand the work beneath them, and plan the project with a clear written estimate.

  • Licensed & insured
  • Florida License CCC1332459
  • Free, no-obligation estimates
  • Serving South Florida
Call (754) 714-8445

Free Roofing Estimate

Get a Free Roof Replacement Estimate

The service is already selected for you.

Add project details (optional)

No obligation. We use your details to respond to this request.

Prefer to speak now? (754) 714-8445

Real M&M projects

See the possibilities on real M&M roofs.

A roof replacement can keep the look you love or give your home a different style. Explore these completed tile, metal and shingle projects to see the choices in place.

Completed Newpoint Barcelona 900 concrete tile roof in Avalon Beach Blend viewed from above in Parkland, Florida.

Parkland · Completed roof

Barcelona 900 concrete tile

Avalon Beach Blend on a completed Parkland roof.

See this Parkland project
Completed 24-gauge Regal Blue standing-seam roof across adjoining roof sections in Miramar, Florida.

Miramar · Completed roof

Tile to standing-seam metal

24-gauge Regal Blue panels with 1.5-inch mechanically seamed joints.

See this Miramar project
Completed GAF Timberline asphalt shingle roof in the Shakewood color in Deerfield Beach, Florida.

Deerfield Beach · Completed roof

GAF Timberline shingles

A completed shingle roof in the Shakewood color blend.

See this Deerfield Beach project

Find the right fit

Which roof fits your home and your plans?

Start with the look you want, your budget and the work your roof needs. We compare suitable systems with you and explain what each written proposal includes.

Completed Barcelona 900 concrete tile roof in Avalon Beach Blend in Parkland

Concrete or clay tile

Choose the shape and character of your roof.

Compare curved and flat profiles, colors and how the finished roof will look with your home.

What to compare: Confirm the roof's suitability, tile availability, attachment and the work beneath the tile.

Explore tile roofing
Completed blue standing-seam metal roof with finished hips and valleys in Miramar

Standing-seam metal

A different look with long, clean roof lines.

Compare panel styles and finishes, including a tile-to-metal conversion where the home and selected system allow it.

What to compare: The panel, fasteners, coating and roof shape affect the installation and ongoing care.

Explore metal roofing
Completed GAF Timberline architectural shingle roof in Shakewood in Deerfield Beach

Architectural shingles

Dimensional texture and a choice of color blends.

Consider architectural shingles alongside your budget, exterior colors and the shape of your roof.

What to compare: Include underlayment, ventilation, starter, ridge and flashing details in the comparison.

Explore shingle roofing
M&M Roofing crew installing a built-up flat roof in Fort Lauderdale

Flat and low-slope systems

Plan for the lower roof sections, too.

A patio, garage or connected flat roof may need a different roof system from the main house.

What to compare: Compare drainage, tie-ins, insulation where specified, and the complete membrane assembly.

Explore flat roofing

The roof deck, slope, condition and selected system determine what is suitable. Product approvals, structural needs and any HOA requirements also belong in the plan.

Plan around your budget

What might your roof replacement cost?

Build a preliminary planning range for shingle, tile, metal, flat, or mixed-roof work in about 60 seconds. Measurements, inspection findings, access, materials, and the permitted scope still need to be confirmed before final pricing.

See what changes the price in Broward County

Hurricane mitigation grant planning

Planning a roof replacement with My Safe Florida Home?

My Safe Florida Home — Stronger Homes. Safer Florida.

Eligible low- and moderate-income homeowners may receive up to $10,000 for approved hurricane mitigation improvements, subject to program approval and available funding. Replacing the roof covering alone does not qualify: the roofing work must support improvements recommended in the program inspection, such as roof-deck attachment, roof-to-wall connections, or secondary water resistance.

You submit your application through the official program. M&M Roofing can review your inspection report, plan the roofing scope, and provide installation photos and project paperwork for your submission. The program determines eligibility and reimbursement.

Receive grant approval before permits and construction. Gather estimates first, then follow the program’s approval sequence before a construction permit is issued or roofing work begins.

Underlayment options for your roof system

  • Shingle roofing

    Polystick IR-Xe

  • Metal roofing

    Polystick XFR

  • Tile roofing

    Polystick TU MAX

We select the underlayment and installation method as part of a compatible approved roof assembly that addresses the recommended improvement. A product name alone does not establish grant eligibility or secondary water resistance compliance.

Understanding your estimate

What’s included in your roof replacement proposal?

The scope depends on your roof type and exactly what we are doing. In most M&M Roofing replacement projects, the proposal includes the following items for the agreed work.

  • Materials for the agreed roof system
  • Removal and disposal of roofing debris
  • Permitting for the contracted project
  • Engineering for the contracted project
Typical plywood and fascia allowances
MaterialUsually includedTypical cost beyond the allowance
PlywoodAround 5 sheets$100 per additional sheet
Standard fasciaFirst 20 linear feet$12 per additional linear foot

Cedar fascia can cost more than standard fascia. These are typical allowances and rates; your written proposal confirms the included quantities and pricing for your project.

Can you stay home during a roof replacement?

Yes, you can stay home during your roof replacement. The main things to plan for are the demolition noise, your pets’ comfort, and driveway access for the dumpster.

Plan for demolition noise

Removing the old roof involves a lot of banging overhead. If you work from home, plan around that noise, especially for calls, meetings, or work that needs quiet.

Keep your pets in mind

The noise during demolition can bother pets, too. Consider how your pets respond to loud sounds and plan a comfortable place for them while that work is happening.

Leave driveway access for the dumpster

We need access to your driveway for the dumpster. Depending on the parking plan, you may keep your car inside the garage or park somewhere else. If you need to drive out during the work, arrange parking before the dumpster arrives and confirm the plan with our team.

Planning your Broward County project

How long does roof replacement take?

Once required approvals are in place and materials are ready, our typical Broward County construction ranges run from the start of demolition through final inspection:

Shingle reroof or shingle to metal
1–2 weeks
Tile reroof or tile to metal
2–3 weeks

These are planning estimates, not guaranteed completion dates. They include inspection-related waiting and do not mean the crew is on your roof every day. Installing the roof covering and completing final inspection are different milestones; ask for both dates in your project-specific schedule. Weather, roof size, access and hidden wood damage can change the schedule.

Before work starts, HOA review and permitting can overlap where the process allows. Material availability can also affect your start date, especially if your selected concrete tile needs to be ordered. Confirm your roof system, profile and color early so we can check supply and plan the next steps.

Read our full Broward County roof replacement timeline

The work beneath the finished roof

A sound deck comes before the new roof.

These Miramar project photos show plywood repairs and TU MAX underlayment at the dry-in stage. The case study records the work before its scheduled dry-in inspection.

New plywood patches installed in an existing roof deck during a Miramar tile reroof
Miramar · New plywood where damaged decking was removed.
Polyglass Polystick TU MAX dry-in covering a tile reroof in progress in Miramar, Florida
Miramar · TU MAX dry-in before the recorded inspection stage.

Checks along the way

Which inspections happen during a roof replacement?

Inspections happen at key stages of the work, not just when the roof is finished. These are four typical checkpoints M&M Roofing coordinates during a replacement, illustrated with photos from our actual projects.

  1. Roofing crew refastening plywood roof decking with a pneumatic nailer in Miramar
    Deck refastening in progress · Miramar

    Inspection 1

    Sheathing or roof renailing

    The inspector checks the wood roof decking and how it is fastened, including the required nail spacing and any repaired or replaced areas. This is the checkpoint for the deck beneath the new roof.

  2. Polyglass Polystick TU MAX dry-in covering a tile reroof in progress in Miramar, Florida
    TU MAX dry-in and pipe flashing · Miramar

    Inspection 2

    Roof metal or roof underlayment

    This is commonly the dry-in inspection. The inspector reviews the underlayment, drip edge, valley metal and other roof flashings, and checks that the installed underlayment matches the approved permit documents.

  3. Regal Blue standing-seam panels being installed over Polystick XFR underlayment on a Miramar roof.
    Metal panels and exposed attachment clips · Miramar

    Inspection 3

    Roof in progress

    A small section of the roof covering—shingle, tile or metal—is typically installed for review. The inspector checks the attachment and installation method against the approved roof system so any required corrections can be addressed as the work progresses.

  4. Completed Regal Blue mechanically seamed standing-seam metal roof beside a lake in Miramar.
    Finished standing-seam roof · Miramar

    Inspection 4

    Roof final

    Once the roof work is complete, the inspector reviews the finished installation and any required corrections as part of the permit closeout process.

Your city or county may use different names, combine visits or require additional inspections. The sequence depends on the permitted roof system and the local building department's requirements.

From planning to closeout

How M&M Roofing Handles a Roof Replacement

After the roof system and written scope are selected, the project moves from paperwork and scheduling into tear-off, dry-in, installation, and permit closeout. These are the working stages M&M Roofing coordinates on a typical replacement.

Sequence note: The exact order and calendar can change with the city or county, the approved roof assembly, HOA requirements, inspector availability, weather, material delivery, property access, and concealed conditions discovered during tear-off.

Open any step for the details.

  1. 1. Submit the permit and coordinate HOA documents

    M&M Roofing prepares and submits the building-permit application for the contracted roof replacement. If the property has an HOA or architectural-review process, the applicable material, profile, color, contractor, and owner documents should begin early. We work on HOA and permit submittals together where the applicable process allows, so their review periods can overlap. Association forms, owner signatures, fees, and approval timing vary by community.

  2. 2. Answer plan-review corrections and obtain the permit

    The building department may approve the application or return comments requesting corrections or additional documents. M&M Roofing responds to roofing-plan corrections within the contracted scope and tracks the application through permit issuance. Physical roof work is scheduled after the required permit and prerequisite approvals are in place.

  3. 3. Schedule materials, dumpster, and crew

    Once the permit is available and the selected materials are confirmed, the delivery, debris container, and crew can be coordinated. Materials are often delivered a few days before tear-off, while the dumpster commonly arrives the day before or the morning work begins. Actual timing depends on the property, supplier, weather, and approved schedule.

  4. 4. Protect the home and surrounding property

    Before demolition, the crew establishes access, material-staging, and debris-control areas and protects the home and surrounding conditions for the planned work. Where applicable, that includes covering the pool and setting protection around areas that could be affected by falling material or jobsite traffic.

  5. 5. Tear off the contracted roof areas

    The existing roof covering and underlying layers are removed from the contracted roof sections. On typical wood-deck roof areas, the tear-off continues until the deck is exposed so concealed deterioration, earlier repairs, fastening conditions, and transition details can be evaluated before the new assembly covers them.

  6. 6. Replace authorized plywood and fascia

    Damaged or deteriorated plywood and fascia discovered during tear-off are replaced where needed and authorized. Because concealed wood cannot always be quantified beforehand, the proposal should explain included allowances, unit pricing, documentation, and how approval for additional work will be handled before the crew proceeds.

  7. 7. Install roof metals and the first dry-in layer

    The crew sequences the specified underlayment with the roof-metal and flashing work required by the approved assembly. Depending on the roof, that can include drip edge, valley metal, and required tin tags, tin caps, or related flashing components. The exact products and order must match the permitted roof system.

  8. 8. Pause for required in-progress inspections

    Many jurisdictions inspect part of the dry-in or underlayment before the next layer conceals it. M&M Roofing coordinates the applicable inspection and addresses any required corrections before moving forward. Inspector availability, weather, and the permitted assembly can create a planned pause of several days at this stage.

  9. 9. Complete the material-specific roof assembly

    After the required approval, the crew completes any remaining underlayment and installs the specified tile, metal, shingle, or low-slope roof covering with its attachment, flashing, edge, ventilation, and transition details. The sequence changes by material, so the permit documents and approved assembly control the work.

  10. 10. Punch list, final inspection, and closeout

    M&M Roofing reviews the completed work, addresses agreed customer checklist items and required corrections, completes final cleanup, and coordinates the final inspection. After final approval and permit closeout, the homeowner receives the available completion records, including the certificate of completion when issued by the jurisdiction.

Where the installation sequence changes by material

Tile roofing

A permitted tile assembly may require another underlayment layer or inspection step before the tile is loaded or installed. The crew then installs the tile using the specified approved attachment method and completes the hips, ridges, flashings, and accessories.

Shingle or metal roofing

After the applicable dry-in approval, the sequence generally moves into shingle or panel installation. Fastening, panel or shingle layout, ventilation, flashings, penetrations, valleys, edges, and transitions still follow the covering-specific approved system.

Flat and low-slope roofing

Low-slope work follows its specified membrane, base, interply, cap-sheet, flashing, drainage, and inspection sequence. It should not be assumed to use the same layers or checkpoints as a tile, metal, or shingle roof area.

Roof Replacement FAQs

How do I know whether I need repair or replacement?

The decision depends on the location and cause of the problem, the condition of the surrounding assembly, roof age, material availability, prior repairs, and whether a durable code-compliant repair is practical. An on-site assessment is the right starting point.

Can I compare tile, metal, and shingle in one proposal?

Yes. When the roof design supports multiple systems, M&M Roofing can explain the different assemblies and prepare options. Structural, HOA, product-approval, and permitting requirements may narrow the final choices.

What happens if damaged decking is found?

Decking can be concealed until the existing roof is removed. The proposal should explain how replacement decking is documented, approved, and priced before additional work proceeds.

Will you handle the roofing permit?

M&M Roofing submits the building-permit application for the contracted roof replacement, responds to roofing plan-review corrections, and coordinates the required roofing inspections through final closeout. An HOA approval, when applicable, is a separate process that may require owner signatures, fees, or direct homeowner action.

Request a Roof Replacement Estimate

Tell us about the property and what you are seeing. We will contact you about the next step.

“On-time, on-budget! Absolutely fantastic company;that exceeded all expectations!”
Brad Westover · April 22, 2026 · Google Maps review